For the largest fixed dome structure in the world, there is no home more fitting than New Orleans, Louisiana, a city known for its resilience. For over 40 years, the Mercedes-Benz Superdome has remained a beloved landmark symbolizing both athletic excellence and city pride.
The Superdome was created by law on November 8, 1966, and opened its doors on August 3, 1975. After suffering significant damage during Hurricane Katrina in August 2005, the Superdome reopened on September 25, 2006, with a Saints victory over the Atlanta Falcons. Although the Superdome had reopened, the process of fully restoring it had only begun.
The rebuilding process was no small feat. Having gained international recognition during the hurricane’s aftermath as a last-resort shelter for 30,000 New Orleanians, the Superdome captured the world’s attention as it was being reconstructed. The hurricane-force winds had torn holes in the Superdome’s roof, sending water pouring inside. Once the stadium was declared structurally sound a few weeks later, the work of cleaning, drying, and restoring the structure to its former glory began.
尽快恢复这种大规模的结构,以帮助让新奥尔良回到其脚上似乎令人生畏,但特拉希南建筑师的建筑师和工程师团队评估了损坏,开发了一系列基于性能的基于性能的标准超级多麦,并开始工作。
设计超级化的超多数
这类主要娱乐和体育赛事的尊贵场地的外观 - 包括七个超级碗 - 不得不出于卓越和威望。标准包括开发一个包覆的系统,允许更容易更换,并使用复制原始饰面的颜色完成外部,看起来像新奥尔良圣徒金。该团队希望浮雕铝的美丽来展示,同时还要在未来几年内保留颜色。该材料还必须可形成为面板并足够强以通过升级的风测试,这是未来风暴的预防措施。
该团队由印第安纳州的Company Company Company选择FCFaçade面板,专门从事金属屋顶和墙壁包层。这些面板易于安装和更换,同时也提供令人印象深刻的强度和重要的雨水屏幕保护。
来自Lorin Industries,Inc。的阳极氧化铝,提供了精加工触摸 - 将要形成在Kalzip面板的材料。Trahan Architects任务Lorin,匹配超级群的原始铝制颜色,以便将其退回其1975年的原始美学外观。
To achieve this goal, Lorin developed a new product by using its color consistent processing capabilities and continuously communicating with the experts involved in the project to ensure its product would bring the vision to life. The resulting aluminum enhances the natural characteristics of the metal through an environmentally embracing oxide layer that protects and enhances the multi-dimensional look that no coating can repeat.
在超级群体,伙伴关系出生
Lorin faced a formidable challenge: matching the original look while meeting all stringent finish and performance standards of modern-day exterior building systems. Trahan Architects determined that only Lorin could meet these challenging finishing requirements. The Lorin Light Bronze ColorIn®灰泥压花阳极氧化铝提供给Kalzip在生产过程中表现出极良好,使其成为一种伟大的卷起产品的美观解决方案。
恢复了一个地标,由数字恢复
When the aluminum panel installation was complete in 2010, 365,000 square feet of finished aluminum panels on the new Superdome gleamed out over the resilient city of New Orleans. More than 400,000 pounds of Lorin Light Bronze ColorIn®Stucco embossed anodized aluminum with an architectural Class I anodize layer covered the exterior. Each panel, covered with a fade-proof finish, measures 1x25 feet and weighs approximately 27.5 pounds.
The Superdome’s impressive technology and myriad fan amenities also make it one of the most advanced stadiums in the world. The walk around the Superdome’s exterior plaza stretches .65 miles. In October 2011, an LED lighting system consisting of more than 26,000 lights was installed to illuminate the stadium’s aluminum exterior. This exterior illumination system can reproduce any color, pattern, or image onto the smooth Lorin finish of the stadium panels, which often helps raise awareness for charitable causes.
由于节能系统,预计在2057年之前没有灯具需要更换。2012年,LED照明系统赢得了现场设计杂志,领先的建筑,设计和活动发布的“设计卓越”。如果没有弹性阳极氧化铝的弹性,闪亮的铝,则不能够这种照明。
The partnership between Kalzip and Lorin ensures that the Mercedes-Benz Superdome will long shine with the luster of Saints gold, drawing in visitors and New Orleanians alike as an enduring symbol of resilience and pride.
来源:https://www.lorin.com